This product is no longer promoted on Made-in-China.com. If you find any infringement or
sensitive information of it, please contact
us for
handling. Thank you.
SBS Prefabrication Building Steel Structure Workshop Specifications 1, Well designed and cheap 2, Different size and material 3, Easy to installation 4, Reusable with long use life
The detailed description 1. Light steel structure prefabricated house with color steel sandwich panel, it is easy to install and can be moved, also it can be reused for numerous times. 2. The structure is reliable, also it is waterproof, fireproof, moisture-proof and quake-proof. 3. The design of the prefab house can be multiple modle, we can make as your requested. 4. Flexible layout, beautiful appearance, and high space efficiency. 5. Easy assembly and disassembly: The house can be assembled and disassembled many times, used repeatedly. 6. It can be recycled, and cause little rubbish, so it is environmental protection.
Material Detail
Packaging & Shipping Transportation is a one of the important process: Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow: 1. 40'HQ and 40'open top container In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures. 2.Break bulk At special circumstances, some large construction size will be more than 40 'HQ and 40' open top containers internal dimensions, we suggest customer use trucks, flatbed trailer etc to transport the large construction component to the pier from the factory, then ship by port lifting, so while booking space,customers should book the break bulk. We will cooperate with the customer to provide them the size and weight of the goods, in order to book a reasonable space. Remark: When components are shipped to the site, due to various reasons of transport may cause component deformation (generally for bending, damage to the paint film, etc.), can be in the scene to correct, at present the correction method is generally divided into cold straightening and hot straightening. For bending component, do the mechanical gagging with oil pump, also can use flame (C2H2 and pure oxygen mixed) to the hot straightening, after correction, the paint film that damaged must be repaired.
installation Usually steel structure building is a large installation engineering in the process. Some customers may need SBS assign the professional technical engineer to supervise the installation on site overseas. To such situation, customer should coordinate with us for following aspects: Customer should provide: 1. Translator or assistant on site. 2. All costs raised including: A. visa fee B. Round trip flight ticket C. Accident insurance for the supervisor during the period D. Accommodation E. Daily meals F. Internet G. Local traffic fee (if any) 3. The customer should pay the engineer with supervision fee, which can be negotiated and decided by both. 4. Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries. SBS Hot Sales Long Life Prefabricated Steel Frame Farm If the customers need our workers to help installation, your can contact us and must prepare the above reference materials.
Company Profile: Foshan Shengbang Steel Structure Co., Ltd. Possesses professional large-scale steel structure production equipments and the automatic spraying production line, so we can satisfy the different customers demand. We takes "build your future" as mission and takes company growth as premise. The company has