Product Description
Prefabricated stable steel structure workshop
Service
We can provide you with a complete service from quote, design, manufacture, etc, according to your requirements & drawing. The manufacture procedure including drilling, rust-removing, shot blasting, nondestructive detecting, painting and so on.
When designing and building any structure, there are many factors to consider such as safety, strength, cost and maintenance, etc. The materials must also be sustainable and environmental, thus to make a contribution towards the sustainability of the project itself.
Selecting the correct material for the task is vital, and this choice is now influenced by economic and environmental pressures that were not important several years ago. Save the tree and our earth, please choose light gauge steel framed house. Our technical and R&D support are ready to help you chose the correct grade of steel for each application, which can result in the most cost effective solutions for today's architecture, building and construction requirements.
Packaging & Shipping
Transportation is a one of the important process:
Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:
1.40'HQ and 40'open top container
In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.
2. Break bulk
At special circumstances, some large construction size will be more than 40 'HQ and 40' open top containers internal dimensions, we suggest customer use trucks, flatbed trailer etc to transport the large construction component to the pier from the factory, then ship by port lifting, so while booking space, customers should book the break bulk. We will cooperate with the customer to provide them the size and weight of the goods, in order to book a reasonable space.
Remark:
When components are shipped to the site, due to various reasons of transport may cause component deformation (generally for bending, damage to the paint film, etc. ), can be in the scene to correct, at present the correction method is generally divided into cold straightening and hot straightening.
For bending component, do the mechanical gagging with oil pump, also can use flame (C2H2 and pure oxygen mixed) to the hot straightening, after correction, the paint film that damaged must be repaired.
Installation
Usually steel structure building is a large installation engineering in the process. Some customers may need SBS assign the professional technical engineer to supervise the installation on site overseas. To such situation, customer should coordinate with us for following aspects:
Customer should provide:
1. Translator or assistant on site.
2. All costs raised including:
A. Visa fee
B. Round trip flight ticket
C. Accident insurance for the supervisor during the period
D. Accommodation
E. Daily meals
F. Internet
G. Local traffic fee (if any)
3. The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.
4. Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
If the customers need our workers to help installation, your can contact us and must prepare the above reference mate
Company Profile:
Foshan Shengbang Steel Structure Co., Ltd. Possesses professional large-scale steel structure production equipments and the automatic spraying production
Line